Harvester chain maintenance method

Due to the dust in the chain work, it is easy to be covered with mud, affect the transmission, should be cleaned regularly, can be cleaned in gasoline, and then dip in the oil for about 30 minutes, remove and drip dry and then use. After the end of each season, the chain should be unloaded and put into oil. After being boiled, it should be wrapped in butter and put in a dry place. The sprocket should be scrubbed with gasoline or diesel oil and greased with rust. When installing the chain, the chain should be wrapped around the sprocket first, and then the chain pin should be passed through. The thread should be worn from the inside to the outside so that the connection plate can be installed from the outside and locked. It should also be kept tight, with certain decisive activities. room. When disassembling, you can use the hammer to gently rotate the two connecting pins on the same connecting plate, pull out the pins and remove the chain. If the pins have become thicker, they can be leveled and then removed.

125mm Traffic Light Module

125mm red green 24v Traffic Light Module
This is a new and exclusive product of our company. It can be used in driving school to simulate real traffic lights.This can be also used as your indoor or outdoor decorations and a small gift for your lovely children!
MODULES TO SUITS 125mm red green 24v Traffic Light Module FEATURES
Simple to replace and install in existing 125mm led Traffic lights module.
12-24VDC or 85-265VAC voltage rated.
Highly durable poly-carbonate housing, high-brightness led beads.
Double lens for even light distribution,waterproof material,good effect.
3 Year Replacement Warranty.

P20 Outdoor Led Display Module,Red Green Traffic Light,Powered Traffic Light Module ,Traffic Control Module

Shenzhen Wide Way Optoelectronics Co., Ltd. , https://www.wdmtrafficlight.com